56662 REL 92: 1996-040-00 EXP MID-C COHO SITE/FACILITY DEVELOPMENT |
|
* Expenditures data includes accruals and are based on data through 31-Oct-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
All administrative tasks fulfilled with timely quality products | B: 119. Manage and Administer contract process through subcontracted activities in the Wenatchee and Methow | 01/31/2018 | 01/31/2018 | |
Finishing permitting for sites to be constructed in 2017 (Trinity, 8mile, Early Winters) | C: 165. Support NEPA/SEPA compliance through SAs and EA/Decision Notice w/ USFS | 01/31/2018 | 01/31/2018 | |
Design level drawings and permitting for acclimation sites | D: 175. Produce design and specifications to include permitting for Methow sites | 09/30/2017 | 09/30/2017 | |
Design level drawings and permitting for acclimation sites | E: 175. Produce design and specifications to include permitting for Wenatchee sites | 10/01/2017 | 12/04/2017 | |
Water right applications to be submitted to WSDOE; secure water rights | G: 154. Work with WSDOE on securing water rights and providing documentation as needed | 07/30/2017 | 07/30/2017 | |
Natapoc FH | H: 175. Natapoc FH facility | 01/31/2018 | 01/31/2018 | |
Vegetation and Monitoring at project acclimation sites | J: 47. Vegetation Planting and Monitoring | 01/31/2018 | 01/31/2018 |
Primary Focal Species | Work Statement Elements |
---|---|
Coho (O. kisutch) - Unspecified Population |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 185 | Periodic Status Reports for BPA | 02/01/2017 | ||||||
B | 119 | Manage and Administer contract process through subcontracted activities in the Wenatchee and Methow | 02/01/2017 | ||||||
C | 165 | Support NEPA/SEPA compliance through SAs and EA/Decision Notice w/ USFS | 02/01/2017 | ||||||
D | 175 | Produce design and specifications to include permitting for Methow sites | 02/01/2017 | ||||||
E | 175 | Produce design and specifications to include permitting for Wenatchee sites | 02/01/2017 | ||||||
F | 132 | [No Report Required] | 02/01/2017 | ||||||
G | 154 | Work with WSDOE on securing water rights and providing documentation as needed | 02/01/2017 | ||||||
H | 175 | Natapoc FH facility | 05/30/2017 | ||||||
I | 171 | Test Well at Two Rivers Acclimation site or Tall Timber Acclimation site | |||||||
J | 47 | Vegetation Planting and Monitoring | 02/01/2017 |